Uploaded image for project: 'JDK'
  1. JDK
  2. JDK-6812426

RE build should check sync state of integration and master workspaces prior to build

    Details

    • Subcomponent:
    • CPU:
      generic
    • OS:
      generic

      Description

      1.4.2_20-b02: build was perfromed prior to full sync of the change from the integration to the master.
      If RE had a step to check the state of syncronization between tghe integration workspaces:
        /net/nightsvr/export4/integration/1.4.2_20/*

      and the master workspaces:

        /net/jdk.sfbay/export/disk7/jdk1.4.2_20

      this may have been avoided.

      Ideall all promotion builds could incorporate this check.

        Attachments

          Activity

            People

            • Assignee:
              asaha Abhijit Saha
              Reporter:
              wrockett Walter Rockett
            • Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:
                Imported:
                Indexed: